The operation rate of Tongling Conch's two 10000t/d lines and associated waste heat power recovery generator unit both hit 100% in February

Time:2010-03-11 00:00

See:

Tongling Conch producing and running stably in February, whose two 10000t/d lines reached 100% in operation rate of this month and waste heat power recovery generator unit had been 100% running for consecutive two months.

waste heat power recovery generation was operating stably

Two 10000t/d lines' operation rate reached 100%