Yangwan Conch Carefully Organized To Ensure Exporting Clinker Be Highly Effective

Time:2008-05-04 00:00

See:

At 13:30 on May 1, “San Fong” foreign vessel loading 15096 tons clinker left the Yangwan Conch wharf.

“San Fong” vessel arrived at the port at 17:00 on April 29, the loading work finished at 3:55 on May 1, the entire loading process only spent 20 hour 45 minute.

“San Fong” was the fourth foreign vessel for loading exporting clinker since the first foreign vessel loading exporting clinker on March 26 2008.

Before this, Yangwan Conch separately finished loading work for “Supersun” vessel, “Nobel Success” vessel on April 26 and 27.

Yangwan Conch specially held several exporting meetings since they finished loading the first exporting vessel in the last month. Each related department discussed, summarized experiences of the first exporting clinker, and suggested how to optimize the loading process, organization, operation and increase the interconnection control, the lighting system and the safety device, guarantee the loading process was controlled safely.

Under the leader’s high attention, each related department and the post people closely cooperated, actively strengthened contacting with the border defense, the maritime affair and the shipping company.  The department manager all-the-way tracked, the loading vessel efficiency had been increased because of full preparation, the organization orderly.  It spent 25 hours and 25minutes to finish loading “Super Sun” foreign vessel, and 14hours 45 minutes for “Nobel Success” foreign vessel.