Limestone transportation of the Second Phase of CSKC 3200 tpd clinker production line connected
Time:2016-05-09 00:00
See:
On May 8th, 2016, Limestone transportation of the Second Phase of CSKC 3200 tpd clinker production line was connected, which means the pilot production period of the project.(translator:Huxiaohong)