Limestones of CSKC 3200 tpd clinker production line have been crushed

Time:2014-11-04 00:00

See:

  On 3rd November, 2014, the lime stones of CSKC have been crushed in the crushing system and been successfully transported to the limestone quarry. The successful connection of the limestone crushing system means the on-load commissioning stage of CSKC.(translator:Huxiaohong) 

Stacker Discharges Material