The Second Production Line Reaches The Designed Output And Standard

Time:2011-11-07 00:00

See:

 On Nov 6,2011, the second 4000t/d production line of Xingye Conch succeeds to pass 72 hours’performance index check. 

 The second 4000t/d clinker production line