The Waste Heat Recovery Power Generation Unit of Phase I in Qiyang Conch completed the Grid-connected Generation successfully at a time

Time:2011-09-20 00:00

See:

On Sep.20, 2011, the one-time completion of the grid-connected generation of the 9MW pure low temperature waste heat recovery power generation unit of the first line in Qiyang Conch, showed the waste heat recovery power generation unit put into operation successfully.

WHG site