Zhongguo cement plant company's waste heat recovery generation was operating efficiently in the first four months

Time:2010-05-16 00:00

See:

From January to April,, Zhongguo cement plant company's 24MW waste heat recovery generator got accumulative generating capacity as 55,850 thousand KWh and grid capacity as 52,030 thousand KWh, with the relative running rate of generator unit reaching 99.4%, and generating capacity per ton clinker as 39.22 KWh and reduced the cost by 33.5 million yuan.

5000t/d production line equipped with cement pure low temperature waste heat recovery boiler

The company's 24MW waste heat recovery generator unit