Time:2009-10-22 00:00
See:
At 11:58 a.m. on October 21 in Lu’an Conch, the first joint grinding system with Φ4.2×13m roller press is putting into operation successfully, with performed feeding at 12:18 p.m., the system is keeping the stable running.

The first cement mill puts into operation

On-site confirmation of transmission parts during operation