Digang Conch 4th Cement Mill put into operation

Time:2009-05-02 00:00

See:

At 10:48 on April 30, the fourth Cement Mill of Anhui Digang Conch Cement Co., Ltd. ,with the specification of φ4.2 × 14.5m, was successful put into operation at one-time.

four cement mills smoothly and simultaneously running

The operation of NO. 4 cement mill leads Digang Conch annual cement production capacity to 3.2 million tons with the result of Digang Conch listing in the ranks of large-scale production base of all-around. As it was known, bfore this project, Digang Conch 3rd phase project with 2×5000t/d clinker production lines and the 18,000 kilowatts of WHG for the 2nd phase project have been successfully completed. During the period of in-depth study and implement the scientific concept of development, the performance that the four cement mills have been put into operation one after another, has added vitality and power to the company’s “efficiency improvement and development promotion”, as well as has contributed a lot to conch’s sustainable development.

Digang Conch 3.2 million tons of cement mill system