Time:2009-01-19 00:00
See:
On 2009 January 15th ,the first WHG succeeded in putting into operation. After the construction and commission ,the project finished the test of boiler water pressure and turbine performance test, which provide the technical guarantee for successful operation. At same time, Shimen Conch plan in advance ,communication in time, arrange special people for out coordinating., get the support of power supply department, accomplish the tie in and operation job.
The project running reduced the production cost, step up the competition ability, it has a good significance for promoting reduce of the west gas and developing of the circular economy.