Time:2008-10-01 00:00
See:
Shuangfeng Conch 18000kW WHG unit successfully connected in grid,which collocated 2x5000d/t clinker production line on September 29.
This symbolized that Shuangfeng Conch strided an important step on carrying out the national energy conservation and emission reduction policy, developing the circulation economic aspect.
This project smoothly put into operation, effectively alleviated the local power supply pressure , further advanced enterprise's energy conservation and emission reduction, lowered the production cost, enhanced the market competitiveness and became a new economic growth.
At the same time,which also made a bigger contribution on pushing new industrialization forward and promoting local economy development.


